Sunday, 10 March 2024

The Big Build 2024

 The BIG Build 2024.

Weeks 1 and 2

Day 1. Work begins, materials arriving.
 

Day 1. Walls stripped and wall divider built.

Day 1. Making a start on the drains.

Day 2. Walls plastered. Floorboards removed to start installing new pipe work.


Day 3. New drains covered over. More concrete slabs removed.

                                                        Day 3. Starting to fit new boiler.

                                    Day 4. Removing ceiling between existing kitchen and bathroom.
                                       Day 4. Starting to remove side of kitchen chimney.

Old wallpaper discovered 1940's?
                                                                             

Day 5. Continuing to lay pipes.


Day 5. October 26 1973 newspaper under floorboards


WEEK 2. Day 6. Hot water tank removed

                                                                           
                                                           Day 6. More old wallpaper revealed.
Day 7. Roof work fitting the vent for the boiler.
                                                                            
                                                                         
Day 8. Visit of gas inspector to approve new boiler. Hot water and heat returns.

                                                       Day 9. New window fitted in shower room.
                                             Day 9. I started to prime fresh plaster with undercoat

                                                         
                                            Day 10. Fitting shower with outlet pipe.

Day 10. More undercoat
Day 10. Started to add shower room furniture.

WEEK 3. Day 11

Shower walls being added
Sinks in
Preparation for floor covering.

Day 12. Beginning to lay waterproof flooring
                                                                                
                                                   Day 13. Toilet and shower complete                               
                                           
                                                     
                                                      Day 14. Our brilliant builders.
                                                     

                                                       Shower and toilet complete.
                                                     


                                                   
                                                      Tiles for splashback behind sink and window over door ordered.
                                                      Now to paint.
                                             
                                                      In the old bathroom stripped and ready to be demolished.
                                                      


                                                    
                                                      More old wallpaper revealed.


                                                     
                                                     The only insulation was 1 inch polystyrene!
                                                     
                                                     Hanslope Public Baths
                                                 
                                                      Day 15
                                                      

Dr Who has arrived.


                                                   
                                                     Our extension has gone. We have a new back door!

                                                      
 
We have a bit of a different view out of our back window!

Week 4. Day 16


The digger's arrived and is making ready the foundations.
No Roman coins as yet!

Day 17. The big grab.



We now have a big hole ready for laying foundations.
Also an old bottle was found while digging, a beer bottle from Phipps brewery, Northampton.
Complete with pot stopper.

Day 18
                                                                              

                                         Finishing off digging out the clay and old foundations.

                                                                            Day 19.

Pipes laid and gravel packed in.
                                                                         
                                                                           Day 20.
                                             
                                 Groundworks ready for steel and concrete. Patio cleaned of clay.

Tiles fitted and the bathroom is now complete.
Next job decorating.

                                               Week 5. Day 21

                                                     

Steel reinforcement being laid.

                                                                     Day 22/23

                                                                             


                                               
Steel laid and ready for the concrete.

                                                                           Day 24


The concrete has arrived.


Pumping and levelling 

This is very exciting. Waiting for the ball to appear, after cleaning the pipe.


The completed concrete raft

Week 6.
Day 25
 
We have lift off.

Day 26.


The walls are rising at speed.

Day 27.

First few layers of brickwork.

Day 28.

The walls are flying up.

Men at Work

Week 7.
Day 29


Going up and up

Day 30

 Almost there.

Day 31.
Scaffolding arrives
More materials arriving
Scaffolding going up and a start on inside walls
The roof window has arrived

Enclosed in scaffolding.

Day 32/33

The walls are ready for the roof.


The view from on top of the scaffolding.

Week 8.
Day 34


The wood arrives for the roof in the morning

The roof beams are built by the afternoon.

Day 35

Continuing to build the roof.

Day 36.

Today involved finishing the wooden roof frame, insulation and
the roofers came to start adding the waterproof felt finish.

Day 37

The roof is almost finished.

Day 38.

The roof is finished complete with sky light.

WEEK 9.
Day 39/40

Laying the underfloor heating.

Scaffolding taken down.


Day 41

A layer of concrete is added to insulate and store heat from the underfloor heating.
A day to dry.

Day 43

We're all bricked up. New door into extension will be built!


Back door bricked up and walls for the downstairs toilet 
and utility cupboard started.

WEEK 10.
Day 44


Plaster boards arrived for inside walls and ceiling


New door cut into kitchen wall.

Day 45


Started to dismantle the old kitchen


More old wallpaper discovered.


Plumbing and electrics


Windows and doors have arrived

Day 46.

 
View into the garden


Dust sheets ready for demolishing the wall between our sitting room
and the old kitchen


Windows and doors fitted

Day 47.


We now have one big room. Great for waltzes.


Day 48

Making a start on fixing the plaster boards.

Week 11.
Day 49


Plaster boards finished. Next job is plastering the walls.

Day 50/51


Plastering going really well. Lights in.

Week 12.
Day 53/54


'Dave the decorator' has started painting the new kitchen extension.
New doors being fitted.


Moving into front room, new door, new light fittings and started to 
fit plaster boards.

Day 55

Starting to fit the kitchen

WEEK 13.

Day 56-59


Kitchen furniture and fittings being added.


Soon beginning new flooring and walls to be plastered.
Rest of old kitchen to be removed.

Day 60




The kitchen has gone, the floor has been removed 
and plaster boards have begun to be added
 WEEK 14.
Day 61


Our old kitchen wall looks like a work of art!

 Day 62\64


Plastering the front room and preparing the floor for the covering.

Week 15. The last full week.
Day 65


Floor is ready for final top layer


Kitchen bar complete.

Day 66


Starting to landscape back patio area


New floor fitted

Day 67, (next to last full day)




Finishing off details. Downstairs toilet, electrics inside and outside.
Tiling in kitchen and downstairs toilet.
Continuing to lay patio area.



The boys are doing a great job cleaning.

DAY 68.
The Final Day and completion of our build.






 
Our brilliant builders


The whole crew


The final delivery, gravel.


The builders have left us a brilliant new build, a big thank you to all.